Design led manufacturing under Telecom PLI scheme gets enthusiastic response from Telecom manufacturers

Ministry of Communications

azadi ka amrit mahotsav

Design led manufacturing under Telecom PLI scheme gets enthusiastic response from Telecom manufacturers

32 companies including 22 MSMEs submit applications

Posted On: 26 AUG 2022 7:46PM by PIB Delhi

Prime Minister Narendra Modi’s vision of Atmanirbhar Bharat is taking concrete steps in Telecom equipment manufacturing. Government has received 32 applications for Design-led PLI scheme.

Production Linked Incentive scheme in telecom sector was launched in 2021. A total of 31 companies are now manufacturing various telecom equipment under the PLI scheme.

To promote the entire value-chain in telecom manufacturing, Design-led PLI was launched in June 2022. It provided additional incentive of 1% over and above the existing incentives for products that are designed in India. The application window was open from 21st June till 25th August, 2022.

A total of 32 companies (22 MSMEs, 5 Non-MSME Domestic and 5 Global) have submitted applications. 17 of these 32 companies have applied as Design-led manufacturers. It is heartening that 18 new companies have submitted applications.

India is poised to emerge as design and manufacturing hub for telecom and networking equipment.

RKJ/M

(Release ID: 1854731) Visitor Counter : 98

LEAVE A REPLY

Please enter your comment!
Please enter your name here